TOPIC | 2.0 | PAD CHANGE DATA |
| 2.13 | Wed Nov 15 1995 20:50 | CMP.A2 Pad Change 11/15/95 | 19 lines |
| 2.56 | Tue Dec 12 1995 22:47 | Pad Replaced 12/12/95 7:30 p.m. | 13 lines |
TOPIC | 3.0 | CONDITIONER CHANGE DATA |
| 3.10 | Sat Jan 06 1996 19:45 | CMP.A2 CONDITIONER DISK CHANGED | 7 lines |
| 3.24 | Sat Dec 14 1996 14:37 | Conditioning Disk & Pad Replaced - Wafer Breakage | 20 lines |
TOPIC | 5.0 | CMP.A1 EE/PE PASSDOWNS |
| 5.101 | Fri Nov 10 1995 22:47 | Wafer Fly-out experiment | 15 lines |
| 5.108 | Sat Nov 18 1995 22:25 | CMP.A1 Status 11/18/95 | 12 lines |
| 5.111 | Fri Nov 24 1995 22:32 | Air Motor Replaced | 9 lines |
| 5.119 | Sat Dec 30 1995 18:21 | Shuttle Lubed & Adjusted / Right Cleaning Station Air Motor Noisy | 11 lines |
| 5.124 | Fri Jan 05 1996 22:38 | Robot "at Left Load" Position Changed. | 5 lines |
| 5.125 | Sat Jan 06 1996 22:33 | Robot Pnuematic Sensor. | 15 lines |
| 5.148 | Thu Feb 01 1996 22:27 | Robot End Effector Pressure too low | 19 lines |
| 5.150 | Fri Feb 02 1996 22:15 | Robot Vacuum Sensor Calibrated | 6 lines |
| 5.154 | Thu Feb 15 1996 22:30 | Rotbot Vac Switch in need of adjustment | 7 lines |
| 5.159 | Thu Feb 29 1996 22:38 | Robot Pick-up Problems on both Send Stations | 27 lines |
| 5.165 | Sat Mar 09 1996 22:29 | Conditioner Head / Right Send Elevator - Software Bug | 16 lines |
| 5.171 | Thu Mar 14 1996 22:43 | Robot bottom position @ L Send/ Robot Load Pos Changed | 28 lines |
| 5.175 | Sat Mar 16 1996 22:37 | Robot Vac Problems / Load Station Drop-Off Positions | 25 lines |
| 5.183 | Thu Mar 21 1996 22:25 | Wafer Fly-Out & Breakage @ 7:10 p.m. | 11 lines |
| 5.185 | Fri Mar 22 1996 22:42 | 32" Pad cut down & installed | 7 lines |
| 5.189 | Thu Mar 28 1996 22:43 | Strasbaugh Cleaning Station Brush Height Adjustment | 9 lines |
| 5.214 | Thu Jun 06 1996 23:22 | Pad & Conditioning Disk Changed | 5 lines |
| 5.220 | Sat Jun 29 1996 22:57 | Squeaking Noise In Bridge | 10 lines |
| 5.226 | Sat Jul 13 1996 23:48 | Large scratches on wafers / conditioning disks suspected | 10 lines |
| 5.288 | Fri Nov 15 1996 22:17 | Wafer Breakage / Left Hub o-rings Shredded | 17 lines |
| 5.289 | Sat Nov 16 1996 22:15 | Wafer Breakage | 11 lines |
| 5.295 | Sat Dec 07 1996 22:47 | Amperage spikes during downforce ramp / Wafer fly outs | 26 lines |
| 5.303 | Sat Dec 14 1996 22:25 | Broken Wafers - Pads Suspect | 14 lines |
| 5.316 | Fri Dec 27 1996 22:34 | Robot Errors / Robot top Arm Sensor Cleaned | 16 lines |
| 5.318 | Sat Dec 28 1996 22:20 | Robot Z Axis Failures / Encoder Cable Replacement | 44 lines |
| 5.322 | Thu Jan 02 1997 22:31 | Computer Replaced / video control boxes NG | 16 lines |
| 5.324 | Fri Jan 03 1997 22:37 | Video Controller Box Back Ordered / Temporary Set up in Place. | 11 lines |
| 5.329 | Fri Jan 10 1997 21:58 | Vacumm leaks at the hubs / o-rings replaced | 22 lines |
| 5.336 | Sat Feb 08 1997 22:24 | Left Spindle Rotory Union Leaking Vacuum. | 27 lines |
| 5.341 | Fri Feb 14 1997 22:25 | Tool EMO'ing Itself / Table RPM Low Errors | 25 lines |
| 5.345 | Sat Feb 22 1997 22:37 | Faulty Door Interlock Switch / Robot Rotation Homing Failure | 26 lines |
| 5.350 | Sat Mar 01 1997 22:04 | Dorr Latches Need Replacement | 11 lines |
| 5.352 | Sat Mar 08 1997 20:04 | Carriers Sticking To Pad | 35 lines |
| 5.353 | Sat Mar 15 1997 13:48 | Conditioner Head Rotation Failures | 38 lines |
| 5.356 | Fri Mar 21 1997 22:40 | Right Carrier Fell Off Hub / New Fairchild Vac Regulator | 19 lines |
| 5.358 | Sat Mar 22 1997 22:32 | Left Spindle Dropping Carrier | 23 lines |
| 5.364 | Wed Apr 02 1997 23:28 | Load Stations Adjusted | 9 lines |
TOPIC | 6.0 | CMP.A1 PM CHECKSHEETS |
| 6.13 | Sat Jan 06 1996 19:59 | CMP.A1 - WW27 - WEEKLY PM CHECKSHEET | 92 lines |
| 6.83 | Wed Mar 05 1997 21:47 | WW36 WEEKLY PM CHECKSHEET | 78 lines |
TOPIC | 7.0 | CMP.A2 EE/PE PASSDOWNS |
| 7.91 | Fri Nov 10 1995 22:51 | Wafer Fly-Out Experiment | 9 lines |
| 7.94 | Sat Nov 18 1995 22:27 | CMP.A2 Status - 11/18/95 | 9 lines |
| 7.101 | Fri Nov 24 1995 22:40 | Conditioner Arm Actuator "Rod End" Replaced | 13 lines |
| 7.109 | Wed Dec 13 1995 22:16 | Wafer Breakage | 7 lines |
| 7.112 | Sat Dec 30 1995 18:39 | Shuttle Adjustments / Air Motor Performance | 27 lines |
| 7.127 | Thu Feb 08 1996 23:29 | Strasbaugh Robot Upgrade | 9 lines |
| 7.130 | Fri Feb 09 1996 22:27 | Robot Upgrade completed | 5 lines |
| 7.131 | Sat Feb 10 1996 22:46 | Robot Vacuum Sensor needs recalibration | 10 lines |
| 7.135 | Thu Feb 15 1996 22:27 | Slurry Pump hoses replaced | 6 lines |
| 7.159 | Fri Mar 22 1996 22:39 | Wafer Fly-Outs - Cut Down Speedfam 32" IC1000 Pads | 21 lines |
| 7.188 | Fri May 24 1996 23:25 | Slurry on Pad during Wet Idle Mode | 10 lines |
| 7.194 | Sat Jun 08 1996 13:19 | Robot Cable Replaced / Cable not the same. | 16 lines |
| 7.196 | Wed Jun 12 1996 23:38 | Particles - Cal Var #158 changed from 0 to 1 | 12 lines |
| 7.213 | Sat Aug 24 1996 19:53 | Dropping Wafers At Lift Off / Right Hub O-Ring Replaced | 10 lines |
| 7.215 | Fri Sep 06 1996 22:53 | Left Spindle Vacuum Errors | 8 lines |
| 7.259 | Fri Oct 25 1996 23:14 | Wafer Crash - No Slurry Flowing | 10 lines |
| 7.264 | Fri Nov 01 1996 22:31 | Robot Vac Switch / Left Spindle Vac Error / D.I.- SLurry Valves | 30 lines |
| 7.268 | Sat Nov 09 1996 22:08 | Left & Right Spindle Rotory Unions Replaced | 25 lines |
| 7.273 | Thu Nov 14 1996 22:28 | Polish Tub Water Level Alarms. | 11 lines |
| 7.275 | Fri Nov 15 1996 22:27 | Polish Tub Level Errors / Remote Vacuum Pump | 18 lines |
| 7.276 | Sat Nov 16 1996 22:23 | Pad Replacement Due To Poor Uniformity | 10 lines |
| 7.278 | Thu Nov 21 1996 22:37 | Wafer Detected On Robot Errors | 9 lines |
| 7.289 | Fri Dec 13 1996 22:23 | Right Spindle Hub (GAP) Adjusted. | 10 lines |
| 7.290 | Sat Dec 14 1996 22:35 | Broken Wafers / Wafers Sticking To Pad - Suspect Pads | 25 lines |
| 7.296 | Fri Dec 27 1996 22:25 | Robot errors / ruptured tubing. | 15 lines |
| 7.302 | Sat Jan 18 1997 22:07 | Wafer Breakage / 2 Product Wafers Scrapped | 45 lines |
| 7.306 | Wed Jan 22 1997 22:27 | "Wafer Not Found On Robot " - Errors | 10 lines |
| 7.316 | Sat Feb 01 1997 22:16 | Robot & Left Spindle Vacuum Failures | 35 lines |
| 7.328 | Thu Feb 13 1997 22:33 | Gearbox Replaced | 23 lines |
| 7.330 | Fri Feb 14 1997 22:35 | Can't get the Bridge to Table sweep alignment in. | 18 lines |
| 7.332 | Sat Feb 15 1997 22:41 | Gearbox install update | 32 lines |
| 7.338 | Wed Feb 19 1997 22:33 | Gearbox Update / Mounting Screws Turned Down | 18 lines |
| 7.349 | Thu Apr 03 1997 22:19 | 4" COnditioning Disk Experiment Ongoing. | 15 lines |
| 7.355 | Fri Apr 11 1997 23:25 | System leaving wafers on pad at lift off. | 9 lines |
| 7.375 | Fri May 09 1997 23:33 | Scratches on Wafers / Cleaning Station Air Motors | 8 lines |
TOPIC | 8.0 | CMP.A2 PM CHECKSHEETS |
| 8.40 | Fri Jun 14 1996 20:38 | WW50 ANNNUAL P.M. | 202 lines |
| 8.90 | Thu Apr 17 1997 16:18 | WW42 Weekly PM Checksheet | 81 lines |
TOPIC | 15.0 | STRASBAUGH GENERAL ISSUES |
| 15.9 | Wed Jan 22 1997 22:23 | Gimbal Bearings Replaced - #3 & #11 | 6 lines |
| 15.11 | Sat Apr 12 1997 23:46 | Bad Pads Removed From Room | 9 lines |
TOPIC | 17.0 | CMP.B1 EE/PE PASSDOWNS |
| 17.92 | Fri Nov 17 1995 22:23 | Slurry pump hose/wafer breakage - COnd gimbal assem | 19 lines |
| 17.94 | Sat Nov 18 1995 22:02 | Wafer Breakage Recovery / System Status | 23 lines |
| 17.107 | Fri Dec 01 1995 22:31 | Load Cup height adjustment | 20 lines |
| 17.117 | Thu Dec 07 1995 22:17 | Vacuum Tank Popet Valve rebuilt / Head #4 Wafer Loss Sensor | 45 lines |
| 17.125 | Sat Dec 16 1995 22:20 | R Recieve Elev Dump Valve / Vac Tank Poppet Valve | 19 lines |
| 17.130 | Fri Dec 22 1995 20:26 | Scratches | 11 lines |
| 17.137 | Thu Jan 04 1996 21:54 | Infranor's rewired / Scrubber Rebuilt | 18 lines |
| 17.150 | Thu Jan 11 1996 22:14 | Particle Problems / Slurry Filter Changed | 10 lines |
| 17.188 | Thu Feb 08 1996 23:36 | High Particles | 13 lines |
| 17.189 | Thu Feb 08 1996 23:46 | Carrier #1 Rotation Motor will be replaced. | 13 lines |
| 17.192 | Fri Feb 09 1996 22:32 | Head #1 rotation failures / new cables on the way. | 8 lines |
| 17.203 | Sat Feb 24 1996 22:24 | Inverter Timeout Error-Table RPM / Head #4 Rotation Errors. | 16 lines |
| 17.210 | Fri Mar 01 1996 22:27 | Spindle Rotation Error on Heads #4 & #5 | 7 lines |
| 17.230 | Thu Mar 21 1996 23:26 | Head #4 Cable Upgrade / Load Cassette Mapper Controller | 15 lines |
| 17.231 | Fri Mar 22 1996 22:26 | Load Cassette Mapper Controller Replaced. | 9 lines |
| 17.253 | Fri May 24 1996 23:10 | Head Rotation Errors / Infranor MC Adjustments Made. | 13 lines |
| 17.256 | Wed May 29 1996 23:34 | Robot Controller Replaced / Head #2 Rotation Errors | 13 lines |
| 17.259 | Thu May 30 1996 23:37 | Head #1 Rotation Cable Is Bad | 7 lines |
| 17.269 | Thu Jun 06 1996 23:19 | Rotation Errors / CDATA.CMP File Changed | 23 lines |
| 17.272 | Wed Jun 12 1996 23:29 | Head #1 Rotation Error - Experimental Pad On Table | 11 lines |
| 17.279 | Sat Jun 29 1996 23:29 | Carrier to CUp Alignment Problems/Table Drains/Rust on Table | 30 lines |
| 17.294 | Sat Jul 13 1996 23:44 | Invertor Communication Errors / IO_ILD3 recipe corrupted | 38 lines |
| 17.305 | Sat Aug 03 1996 23:35 | High Particles Continue / Pads and/or Slurry suspected | 52 lines |
| 17.326 | Fri Aug 16 1996 23:48 | Load Flipper Problems | 52 lines |
| 17.328 | Sat Aug 17 1996 23:40 | Elevator Dump Valve Sticking / DI Water Leak In Fluids Cabinet | 19 lines |
| 17.336 | Wed Aug 21 1996 23:40 | Head #1 Rotation Motor On Order / Elevator #1 Dump Valve Sticking | 19 lines |
| 17.338 | Thu Aug 22 1996 23:39 | Hard Drive Problems / Head #1 Rotation Failure | 15 lines |
| 17.340 | Fri Aug 23 1996 23:14 | Hard Drive Replaced / Elev #1 Dump Valve Replaced / Head #1 Rotation Probs | 20 lines |
| 17.342 | Sat Aug 24 1996 19:48 | Head #1 Rotation Error Problem - Update. | 40 lines |
| 17.348 | Thu Aug 29 1996 23:12 | Head #2 Rotation Errors / Dump Valve Leak | 15 lines |
| 17.349 | Sat Aug 31 1996 23:24 | Head #1 Rotation Error During Segment #3. | 14 lines |
| 17.352 | Wed Sep 04 1996 23:36 | Tank #2 Dump valve | 10 lines |
| 17.353 | Fri Sep 06 1996 22:50 | Robot Deservoed Itself Twice | 8 lines |
| 17.383 | Thu Sep 26 1996 23:21 | Head #1 Rotation Errors | 9 lines |
| 17.417 | Fri Oct 18 1996 23:15 | Head #1 Load Cell Calibration Activity. | 10 lines |
| 17.428 | Fri Oct 25 1996 23:09 | Rotation Motor Changed / High Particles | 26 lines |
| 17.447 | Sat Nov 02 1996 22:36 | Software Locking UP During Wafer Loading Sequence | 21 lines |
| 17.455 | Thu Nov 14 1996 22:23 | High Particles / Broken Scrubber Drive Belt | 22 lines |
| 17.457 | Sat Nov 16 1996 22:27 | High Particles / Tool Cleaned & Pad Replaced | 13 lines |
| 17.465 | Thu Nov 21 1996 22:28 | System Paused in Seg #1 / Broken Wafers. | 9 lines |
| 17.482 | Sat Dec 14 1996 22:47 | Inverter Comm Errors - Suspect Wafer Loss Board | 22 lines |
| 17.494 | Fri Dec 27 1996 17:59 | Head to Head Removal Rate & Uniformity Problems | 48 lines |
| 17.495 | Fri Dec 27 1996 22:42 | Head to Head Removal Rates Still Out Of Spec | 29 lines |
| 17.498 | Thu Jan 02 1997 22:36 | High Particles / Cleaned up ok | 13 lines |
| 17.506 | Thu Jan 09 1997 22:10 | Particle Problem / Slurry System Flushed & Filter Changed | 19 lines |
| 17.508 | Thu Jan 16 1997 22:07 | Conditioner Wheel Replaced | 15 lines |
| 17.510 | Wed Jan 22 1997 22:38 | Broken Wafers In Unload Elevator Tank | 11 lines |
| 17.513 | Thu Jan 30 1997 22:11 | Unload Lift Cylinder Sensor Replaced / Cup #2 Sleeve Honed | 24 lines |
| 17.523 | Fri Feb 21 1997 22:48 | Replaced Slurry Pump #2 Motor/ Calibrated Down Force | 15 lines |
| 17.533 | Sat Mar 22 1997 22:37 | Carrier Rotation Failure | 10 lines |
| 17.539 | Fri Mar 28 1997 22:32 | Rotation Errors | 18 lines |
| 17.541 | Thu Apr 03 1997 23:22 | Carrier to Cup ALign/ Down Force Cal / Infranor Replacement | 46 lines |
| 17.553 | Sat Apr 19 1997 23:30 | Decontamination Punch List - Update | 22 lines |
TOPIC | 18.0 | CMP.B1 PM CHECKSHEETS |
| 18.15 | Wed Jan 10 1996 20:38 | WW28 Monthly PM Checksheet | 28 lines |
| 18.20 | Sat Feb 03 1996 20:02 | (WW31) Monthly P.M. | 29 lines |
| 18.34 | Sat May 11 1996 21:10 | Weekly PM Checksheet - WW45 | 79 lines |
| 18.50 | Fri Aug 02 1996 23:10 | CMP.B1 Monthly P.M. Checksheet for WW5. | 146 lines |
| 18.57 | Fri Sep 06 1996 23:12 | WW10 Monthly P.M. Check Sheet | 146 lines |
| 18.60 | Fri Sep 27 1996 23:21 | WW13 WEEKLY PM CHECKSHEET | 87 lines |
| 18.84 | Thu Feb 27 1997 20:17 | WW35 Weekly PM Check Sheet | 103 lines |
| 18.85 | Fri Mar 07 1997 01:08 | WW36 Monthly PM CheckSheet | 190 lines |
| 18.90 | Fri Apr 11 1997 19:02 | WW41 WEEKLY PM CHECK SHEET | 102 lines |
TOPIC | 19.0 | CMP.B2 EE/PE PASSDOWNS |
| 19.5 | Thu Nov 09 1995 23:08 | Mechanical Acceptance Activity Update | 9 lines |
| 19.7 | Fri Nov 10 1995 22:59 | Mechanical Acceptance Update | 11 lines |
| 19.16 | Thu Nov 30 1995 22:33 | Unload Cup Pedistal replaced / Load cup #3 sensor error | 16 lines |
| 19.18 | Fri Dec 01 1995 22:39 | Unload air cylinder extension rod replaced. / Bent | 6 lines |
| 19.22 | Thu Dec 07 1995 22:33 | Collision between spindle #3 and load cup #3 / Major Damage | 24 lines |
| 19.24 | Fri Dec 08 1995 22:29 | Index Table Replacement | 9 lines |
| 19.25 | Sat Dec 09 1995 21:51 | Index Table Replacement/Load Cup Sticking Prob Action Plan | 14 lines |
| 19.30 | Wed Dec 13 1995 22:20 | Load Cup #3 misload/Springs replaced | 6 lines |
| 19.37 | Fri Dec 22 1995 20:14 | Load Flipper Mis-Load / SV #65 Sticking Open. | 17 lines |
| 19.52 | Thu Jan 11 1996 22:21 | Vacuum System Upgrade | 8 lines |
| 19.91 | Sat Feb 10 1996 22:52 | Transfer Paddle Interference problem | 8 lines |
| 19.98 | Thu Feb 15 1996 22:35 | 2nd Table Process released to Manufacuring | 6 lines |
| 19.102 | Sat Feb 17 1996 22:31 | Wafer Breakage / Speedfam Rep on the way. | 21 lines |
| 19.111 | Wed Feb 21 1996 22:27 | Index Table Load CUps / Flipper Box | 39 lines |
| 19.114 | Sat Feb 24 1996 22:08 | Conditioner Sensor Adj. / Scrubber Down Sensor adj. | 14 lines |
| 19.128 | Thu Mar 21 1996 23:32 | Unload Track #2 double slotting wafers. | 9 lines |
| 19.143 | Sat Apr 13 1996 23:24 | Fatal Error | 11 lines |
| 19.161 | Sat May 11 1996 23:47 | VAC PROBLEMS/CRASH ON SECONDARY TABLE | 30 lines |
| 19.172 | Wed May 29 1996 23:39 | Particles/Head #4 Flyout/Special Primary Pad On Tool | 17 lines |
| 19.181 | Sat Jun 08 1996 12:41 | | 2 lines |
| 19.182 | Sat Jun 08 1996 13:04 | Unload Flipper Sensor Error / Water In The Box. | 20 lines |
| 19.186 | Wed Jun 12 1996 23:22 | Remote Touchscreen Back In Service | 7 lines |
| 19.188 | Fri Jun 14 1996 00:07 | Main Vac Too Low Error / Leadscrew Covers Loose | 20 lines |
| 19.218 | Sat Aug 17 1996 23:46 | MONTHLY PM PARTIALLY COMPLETED & DEFERRED TO WW8. | 13 lines |
| 19.220 | Thu Aug 22 1996 23:45 | Head #5 Fly -outs / Vacuum not present at touch down | 11 lines |
| 19.223 | Sat Aug 24 1996 19:57 | Wafer Misload on Head #3. | 9 lines |
| 19.228 | Fri Aug 30 1996 23:29 | CB #6 Replaced/Index Table Infranor Replaced/ Elevator #1 Drain Tube Loose | 45 lines |
| 19.261 | Sat Nov 09 1996 21:47 | Wafer Loss Detection Board Replacement | 11 lines |
| 19.266 | Fri Nov 15 1996 22:38 | Head #5 Carrier to Cup Alignment Drift Problem | 20 lines |
| 19.267 | Sat Nov 16 1996 23:00 | Head #5 Oscillation Drift / Action Plan | 47 lines |
| 19.279 | Thu Dec 26 1996 22:26 | Misload on head #5. - Rebooted System | 13 lines |
| 19.287 | Fri Jan 03 1997 22:28 | Wafer Breakage / Action Plan For Today | 58 lines |
| 19.300 | Thu Jan 16 1997 21:55 | Conditioning Wheel Changed | 9 lines |
| 19.308 | Wed Feb 05 1997 22:24 | Uniformity problems with head #2. | 22 lines |
| 19.326 | Wed Apr 02 1997 23:32 | Load Flipper Timeout Error | 10 lines |
| 19.327 | Thu Apr 03 1997 23:25 | Small D.I. Water leak under index table | 8 lines |
| 19.328 | Fri Apr 11 1997 23:16 | Load Flipper Timeout Error | 12 lines |
| 19.339 | Sat Apr 19 1997 23:41 | Wafer Breakage - Removal Rate on Head #1 | 22 lines |
TOPIC | 20.0 | CMP.B2 PM CHECKSHEETS |
| 20.25 | Sat Apr 27 1996 21:35 | MONTHLY PM CHECKSHEET WW43 | 147 lines |
| 20.47 | Sat Aug 17 1996 22:59 | WW7 MONTHLY P.M. DEFERRED TO WW8 | 6 lines |
| 20.66 | Fri Dec 13 1996 21:11 | Weekly PM Check Sheet (WW24) | 91 lines |
| 20.74 | Fri Jan 31 1997 16:55 | CMP.B2 WEEKLY CHECK SHEET (WW31) | 90 lines |
| 20.89 | Sat May 10 1997 22:53 | ww45 weekly pm check sheet | 102 lines |
TOPIC | 21.0 | CMP.B3 EE/PE PASSDOWNS |
| 21.11 | Sat May 11 1996 23:56 | Marathon Run Results/Adjustments/Ready for MQC's | 24 lines |
| 21.28 | Fri Jun 21 1996 23:30 | Slurry Delivery Trouble / Timeout Errors - Carriers at Scrub | 29 lines |
| 21.32 | Sat Jun 29 1996 23:01 | Table Gearbox Is Leaking Again | 10 lines |
| 21.39 | Fri Jul 19 1996 23:52 | Head #1 DF & Conditioner DF EP Regulators need Recalibration | 26 lines |
| 21.65 | Fri Aug 23 1996 23:17 | Wafer Loss Detection Sensors Adjusted | 11 lines |
| 21.67 | Thu Aug 29 1996 23:27 | Mapper Timeout / Scrubber Timeout Errors! | 26 lines |
| 21.68 | Fri Aug 30 1996 23:38 | Scrubber Timeout Errors / Dampners Removed | 13 lines |
| 21.69 | Sat Aug 31 1996 23:31 | Load Flipper Failing To Pick Up At Pre Aligner | 9 lines |
| 21.71 | Thu Sep 05 1996 23:22 | Inverter Communication Errors | 9 lines |
| 21.83 | Thu Sep 26 1996 22:42 | Pre Aligner Sensor Failure / Tin Split Lot | 10 lines |
| 21.85 | Sat Sep 28 1996 23:25 | Carrier Rinse For Head #2 Failed to Turn Off. | 12 lines |
| 21.94 | Fri Oct 18 1996 23:28 | Mapper Errors - Please Document All Failures | 12 lines |
| 21.139 | Thu Dec 26 1996 22:19 | EP Regulators, Down Force Calibrated due to Removal & Uniformity | 28 lines |
| 21.143 | Sat Dec 28 1996 22:39 | Head to Head Removal rate probs / Pads suspect | 31 lines |
| 21.149 | Thu Jan 09 1997 22:22 | Moisture Sensor Alarm / Looking For Cause | 7 lines |
| 21.155 | Sat Jan 25 1997 13:51 | System Pausing During Load / Scrubber Time out | 39 lines |
| 21.157 | Thu Jan 30 1997 22:17 | Software Utility Progran Run/No Corrupted Files | 7 lines |
| 21.168 | Thu Mar 13 1997 20:20 | Wafer Breakage / Root Cause Unknown | 44 lines |
| 21.170 | Sat Mar 15 1997 13:20 | Wafer Loss Detection Board Replaced. | 16 lines |
| 21.188 | Fri Apr 11 1997 23:21 | SLurry Detect Error | 15 lines |
| 21.221 | Sun Jun 01 1997 00:17 | Mapper Problems | 42 lines |
TOPIC | 22.0 | CMP.B3 PM CHECKSHEETS |
| 22.20 | Fri Sep 27 1996 21:41 | WW13 Weekly PM | 86 lines |
| 22.22 | Thu Oct 03 1996 19:37 | WW14 Weekly P.M. Check Sheet | 88 lines |
| 22.27 | Wed Nov 13 1996 21:30 | WW20 MONTHLY PM CHECKSHEET | 171 lines |
| 22.39 | Fri Jan 31 1997 16:56 | CMP.B3 WEEKLY CHECK SHEET (WW31) | 90 lines |
| 22.40 | Thu Feb 06 1997 18:19 | WW32 WEEKLY PM CHECKSHEET | 102 lines |
| 22.41 | Sat Feb 15 1997 16:16 | WW33 Monthly PM CheckSheet | 184 lines |
| 22.42 | Thu Feb 20 1997 22:08 | WW34 WEEKLY PM CHECKSHEET | 101 lines |
| 22.43 | Fri Feb 28 1997 13:04 | WW35 Weekly PM Check Sheet | 102 lines |
TOPIC | 23.0 | CMP.B4 EE/PE PASSDOWNS |
| 23.48 | Sat Apr 12 1997 23:43 | Mapper Errors / Wafer Breakage | 66 lines |
| 23.58 | Sat Apr 19 1997 23:50 | Tool now running on 12% slurry from drum. | 24 lines |
| 23.76 | Thu May 08 1997 23:21 | Wafer loss sensor adjusted (head #5) | 8 lines |
| 23.79 | Fri May 09 1997 23:29 | Unload flipper box sealed & adjusted / Srubber station leak / high particles | 38 lines |
TOPIC | 31.0 | SPEEDFAM GENERAL ISSUES |
| 31.16 | Sat Mar 01 1997 22:07 | New Storage Box For Alignment Fixtures | 7 lines |
TOPIC | 32.0 | CMP.B WAFER CRASH FORM |
| 32.6 | Wed Oct 02 1996 21:21 | CMP.B1 Crash on 10/2/96 | 33 lines |
TOPIC | 35.0 | FRACUS |
| 35.1 | Sat Apr 13 1996 23:21 | CMP.B2 fatal error on 4/13/96. | 8 lines |
TOPIC | 41.0 | CMP.D1 EQUIP PASSDOWNS |
| 41.44 | Fri May 23 1997 21:18 | Memorial Day Shutdown Checksheet | 51 lines |
TOPIC | 45.0 | CMP-SCRUB.A1 EE/PE PASSDOWNS |
| 45.62 | Fri Dec 15 1995 22:34 | Scrubber NH4oH OCP's Jumped-out | 16 lines |
| 45.90 | Fri Mar 29 1996 22:21 | "Inside Brush Station" Shaft/Arm Assy Replaced | 8 lines |
| 45.109 | Fri May 24 1996 23:20 | Spin Station Slide Assembly Air Cyl Replaced | 10 lines |
| 45.113 | Thu May 30 1996 23:41 | Outside Brush Station Motor & Bearings Replaced | 11 lines |
| 45.136 | Thu Sep 19 1996 23:32 | IS Brush Station Roller Arm / Transport Belt Slipping | 10 lines |
| 45.150 | Fri Oct 18 1996 23:22 | Timeout Errors - Outside Brush Station | 13 lines |
| 45.153 | Sat Nov 02 1996 22:23 | Recieve Station Lifter Did Not Rise | 11 lines |
| 45.154 | Thu Nov 07 1996 22:38 | Semi Annual Incomplete Checksheet Posted. | 5 lines |
| 45.165 | Fri Jan 10 1997 22:17 | Low Ammonia Alarms / Shut Off Valve Stripped | 25 lines |
| 45.177 | Thu Apr 10 1997 23:28 | Robot Dropped Wafer / Lifter Did Not Rise Up | 11 lines |
TOPIC | 46.0 | CMP-SCRUB.A1 PM CHECKSHEETS |
| 46.64 | Fri Nov 08 1996 21:34 | ww19 Semi Annual PM | 109 lines |
TOPIC | 47.0 | CMP-SCRUB.A2 EE/PE PASSDOWNS |
| 47.63 | Fri Dec 22 1995 20:55 | Send Elevator Sensor Adjustment / Timeout Errors | 13 lines |
| 47.82 | Fri Mar 01 1996 22:31 | Spin Station - Wafers Double Stacked & Broken | 6 lines |
| 47.101 | Wed May 29 1996 23:30 | Roller Bearing Assembly Ordered | 5 lines |
| 47.102 | Thu May 30 1996 23:45 | Send Station Sensor Temporarally Readjusted | 7 lines |
| 47.115 | Wed Sep 04 1996 23:46 | SPin Station Motor COntroller | 9 lines |
| 47.117 | Thu Sep 05 1996 23:25 | High Particles | 9 lines |
| 47.129 | Thu Nov 21 1996 22:32 | Glass Bearings Replaced On the Outside Brush Station. | 10 lines |
| 47.134 | Sat Jan 18 1997 22:34 | Recieve Station Lifter Failed To Rise to the top Position | 27 lines |
| 47.138 | Wed Jan 22 1997 22:33 | Software Upgrade - Unsucessful | 11 lines |
| 47.149 | Thu Apr 10 1997 23:32 | Robot Stopped At Spin Station / Tool Locked Up. | 10 lines |
TOPIC | 49.0 | CMP-SCRUB.A3 EE/PE PASSDOWNS |
| 49.13 | Fri Aug 23 1996 23:23 | Inside Brush Station Roller Arm Cracked | 12 lines |
| 49.17 | Thu Sep 05 1996 23:31 | Robot Dropping Wafers At Spin Station | 13 lines |
| 49.19 | Fri Sep 06 1996 22:59 | Dropping Wafers At Recieve Station Lifter. | 10 lines |
| 49.84 | Sat May 24 1997 23:33 | Robot drop off problems at Lifter | 28 lines |
TOPIC | 54.0 | CMP-SCRUB.C1 EE/PE PASSDOWNS |
| 54.3 | Sat Sep 28 1996 23:17 | Shaft Height Adg / Having Difficulty Removing Pad | 9 lines |
| 54.5 | Thu Jan 16 1997 22:10 | Brushes Replaced | 7 lines |
TOPIC | 55.0 | CMP-SCRUB.C1 PM CHECKSHEETS |
| 55.2 | Sat Aug 31 1996 20:44 | WW9 WEEKLY PM CHECKSHEET | 31 lines |
TOPIC | 61.0 | GENERAL CMP ISSUES |
| 61.6 | Fri Nov 10 1995 23:04 | Table Stpping Problem after polish. /Step #6 value incorrect | 9 lines |
| 61.7 | Thu Nov 30 1995 22:40 | Reworked Speedfam Carrier Rings | 11 lines |
| 61.8 | Sat Dec 16 1995 22:05 | CMP Carrier Status | 26 lines |
| 61.9 | Thu Dec 21 1995 22:32 | Cmp.b2 index table | 7 lines |
| 61.10 | Fri Dec 22 1995 20:00 | OnTrak OCP's repaired and back on-line. / Jumpers removed. | 12 lines |
| 61.13 | Sat Dec 30 1995 18:51 | CMP Start-up Activities / High Putrity D.I. Down | 18 lines |
| 61.15 | Thu Jan 04 1996 22:00 | Speedfam Carrier Plates | 6 lines |
| 61.16 | Sat Jan 06 1996 22:36 | Speedfam Carrier Plates | 9 lines |
| 61.22 | Sat Feb 17 1996 22:40 | SLurry system failure / send carrier plates to speedfam | 25 lines |
| 61.23 | Sat Feb 17 1996 23:06 | Ammonium hydroxide down, Slurry System down. | 8 lines |
| 61.25 | Sat Feb 24 1996 22:32 | 28" Rodel IC-1000 Pads performing Poorly | 12 lines |
| 61.29 | Sat Mar 09 1996 22:41 | Solvent Sink Faucet leak / CMP.A! TCU Temp / Please CLean Carriers | 25 lines |
| 61.31 | Thu Mar 21 1996 23:17 | Strasbaugh BackPressure Recipe Changes | 17 lines |
| 61.33 | Thu Mar 28 1996 22:45 | 10 Speedfam Plates returned for Film Conturing | 5 lines |
| 61.34 | Sat Apr 13 1996 23:33 | High Purity D.I. Water Pipe Break | 11 lines |
| 61.48 | Sat Aug 31 1996 23:34 | WW9 Semi Annual P.M. for B2 Partially Completed | 7 lines |
| 61.49 | Fri Sep 06 1996 23:02 | Slurry Delivery System Failure | 9 lines |
| 61.53 | Thu Sep 26 1996 23:08 | Particle Problems | 42 lines |
| 61.62 | Fri Oct 25 1996 23:25 | House Slurry System Failed - No Alarms Were Activated | 12 lines |
| 61.66 | Fri Nov 01 1996 22:38 | House Slurry System Purge Complete | 13 lines |
| 61.67 | Sat Nov 02 1996 22:44 | Low Removal Rates On Speedfams - Pads Suspected | 15 lines |
TOPIC | 77.0 | IN-COMPLETE PMs |
| 77.1 | Thu Apr 17 1997 23:35 | WW42 MONTHLY PM CHECKSHEET | 188 lines |
| 77.3 | Sat May 24 1997 23:41 | ww47 partial checksheet for CMP_SCRUB.A3 | 46 lines |
TOPIC | 86.0 | OLD PM SCHEDULE |
| 86.1 | Tue Nov 28 1995 18:35 | FY96 CMP PM SCHEDULE | 166 lines |