Title: | DEChub/HUBwatch/PROBEwatch CONFERENCE |
Notice: | Firmware -2, Doc -3, Power -4, HW kits -5, firm load -6&7 |
Moderator: | NETCAD::COLELLA DT |
Created: | Wed Nov 13 1991 |
Last Modified: | Fri Jun 06 1997 |
Last Successful Update: | Fri Jun 06 1997 |
Number of topics: | 4455 |
Total number of notes: | 16761 |
T.R | Title | User | Personal Name | Date | Lines |
---|---|---|---|---|---|
940.1 | Configuration Problem | QUIVER::SLAWRENCE | Wed Apr 27 1994 18:02 | 11 | |
Looks like your bridge is not installed correctly: The Work Group Size Exceeded errors is 54,702. The Root port is 2. You have connected the backbone of your network to the Work Group port on the bridge (this is the hub backplane in a hub, or the 'lanhole' connection on the large flat upper surface when standalone). Can you describe or diagram your configuration? | |||||
940.2 | TENNIS::KAM | Kam USDS (714)261-4133 (DTN 535) IVO | Wed Apr 27 1994 19:39 | 6 | |
OOPS! Backwards.... Regards, kam |