[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference netcad::hub_mgnt

Title:DEChub/HUBwatch/PROBEwatch CONFERENCE
Notice:Firmware -2, Doc -3, Power -4, HW kits -5, firm load -6&7
Moderator:NETCAD::COLELLADT
Created:Wed Nov 13 1991
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:4455
Total number of notes:16761

275.0. "DECagent 1.2 availability?" by TRCOA::TRCP90::ahmed (Politically Incorect Message) Thu Jun 17 1993 18:57


	Is there a date yet for DECagent 1.2?

	I need the functionality of using the Agent to
	manage repeaters in the same hub without a bridge.

	This happening soon will help a large sale.

	Thanx in advance,

	Nadeem
T.RTitleUserPersonal
Name
DateLines
275.1busmaster= winterNAC::SEAVERBill Seaver, HUBwatch MktgMon Jul 05 1993 21:5010
    the bus master versionof the DECagent 90 is planned for sometime this
    winter.  It will be a firmware upgrade of the exisiting agent.  To
    check status see NAC::MANAGMENT:STATUS.TXT
    
    Please let me know how big a sale is hinging on this functionality.  I
    do not htink I can speed thsi up, but data such as that might help.
    
    NB- We are planningon comingout with a DETMI sometime this winter.  It
    will be an 8 port DEChub 90 size 10baseT repeater which will have its
    own integral SNMP agent and thus will not need the DECagent 90.
275.21.2 DECagent also requiredSTROP::LAYLANDFri Oct 08 1993 10:2112
I also require a firm date for the DECagent 1.2. But the DETMI and the 90M would
would be useful. 

The configuration that is required covers 4 locations, each with 3 hubs.
All of these locations will be connected using BRouters (8 ofthem). They also
require management of the hubs, which, currently, requires a DECbridge 90.
This could mean an extended lan of 14 bridges. With management of the hub90
modules, (DETMR and DSRVG) being in the DECagent, the DECbridge would not
be required. Two of the locations do not have load hosts, which suits the
Brouter and not WAN90.

John
275.3We're working on it...ROGER::GAUDETBecause the Earth is 2/3 waterMon Oct 11 1993 15:514
The next version of the DECagent 90 will be V2.0.  We currently expect it to be
available in early Q3.

...Roger...